With this option the user can manually pre-assign quantities for each material line based on the equivalent amount of the parent product. In the quantity field you can specify the quantity of the parent product. Apply changes for the selected lines.
•If Quantity is <= 0, the status bar message appears: "a quantity is required for pre-assigning"
•if Quantity is > 0, calculation is made for each Material in the list, considering part of the quantity of this BoM according to the Parent Quantity Field on the pre-assign button. Consider proportion of calculated scrap quantity. The result will be in the Column "Request" of the Material List.
•If you have reservations, the system will assign the reserved quantity to the right matrix.
•Beas create a transfer request document in background. This don't support any Bin management system. It is possible to choose item from bin managed warehouse, but the bin location information is not saved in the transfer request document
Pre-assign / All pre-assign
With the pre-assign buttons you can assign inventory automatically.
Pre-assign: Action is performed for all marked entries.
All pre-assign: Action is performed for all entries.
The warehouse inventory is pre-assigned to the requirement automatically with the following sorting rules and filter rules:
3. Warehouse and Bin location defined in BoM position
4. Standard warehouse of the item
Within this,
a) batches and serial numbers are sorted by the withdrawal rule according to the Configuration wizard. See: Configuration wizard
b) if Bin managed: Issue Sorting defined in Bin definition
Normal items (not batch- or serial number related) will be pre-allocated only if the issue method was set to "automatic" in the Item master. SeeItem master – Issue method
Note: Allocation warehouse is set up per work station. SeeAllocation window.
Mark all entries in the requirement window section.
Pre-assignment delete
Delete pre-assignment of quantities for the selected lines.
Create request
Create a picklist proposal or picklist proposal + picking list based on the Configuration wizard WMS settings.
Attention:
If you click on the "reload" button while the "Create request" function is being processed by WMS, Beas shows an icon for error (). If you click the "reload" button again, the Beas retrieves the current information. Once the WMS document is generated, the system shows the final message.
When pressing the button Create request, the Produmex icon on the right turns gray, indicating that the proposal has been created.
The icons represent the two responding, running services of the two products. SeeWMS Picklist for production workflow.
Modify Production line selection manually from the editable dropdown.
The line checks if the resource has a Production line, otherwise it applies the position production line.