Work order

Production > Work order general > WO structure 

Top  Previous  Next
Expand/Collapse Toggles

The Work Orders window is the central window for managing all production functions.

 

PATH: Production > Work Orders.

 

Work orders

 WO structure view

         Work order document

 Work orders list

 Assemblies

 

The work orders are shown as a structure.

 

project_yellow Work order

  tool-baugruppe Assembly

      journal_headerJournal postings (overview)

          journal_line Journal transactions, valuations

              journal_sap Journal posting (SAP Journal document)

      item_bomBOM position

          resource1 Material Reservations, Batch information, Allocation

      operationRouting

              timereceipt_gray Time receipt

 

In this list routings, BOMs, Assemblies, Time receipts can be administrated, created new and deleted.

Double-click the upper level (black font or marked with an orange bar) and press the Edit button to open the work order document.        

 

If the work order is not expanded, icons are displayed on the right in column "actual", indicating the current status of the work order.

Right to it, (column drawing number) the utilization of the affected resource is displayed for a selected period in a graphical view.

 

hmtoggle_plus1Notes
hmtoggle_plus1Adapt structure view

 

Meaning of the icons

Work order

Icon

Description

project_blueproject_yellow

Work order (different icons for different types, default: orange)

WO_violet_dot

Second icon – violet dot: the first assembly in this work order is a phantom item – see Item master > Phantom Item

Abort

Work order status: scheduled in APS

fa gedruckt

Work order status: printed

fa angemeldet

Work order status: logged on

flagred

Blocked

flagyellow

Not scheduled

flaggreen

Released and scheduled

 

There are many context-dependant functions (right-click menu) depending on the line – the type of entry – specific features are available.

Right-clicking above in the window (below the title line) opens the window settings for the structure view. See Configuration of WO structure view.

 

Lower buttons

Button

Description

New

Opens a new record of the selected line. For example, if a work order is selected, a screen opens to create a new work order; if a bill of materials position is selected, a screen opens to create a new bill of materials position.

Product Costing Analysis

Creates a temporary post-calculation for the current work order.

 

For notes on structural view see Item structure view – Notes

 

back to work order general

 

See

Structure windows

Item structure view

Configuration of WO structure view

Item breakdown

Data record selection

Window

 

youtube Structure search function

youtube Work order structur view – settings


Help URL: https://help.beascloud.com/beas202109/index.html?fertigungsauftrag_struktur.htm