Post-calculation

Concepts > Post-calculation

Top  Previous  Next

Beas includes a flexible post-calculation function with the following features:

Calculation of accrued costs
Projection
Calculation of planned costs
Calculation at marginal and full costs
Support of calculation schema
Various valuation methods
View results in list or as a structure
Valuation of assemblies

 

Type

Description

Visual

Structured view of the post-calculation (concurring calculation, comparison of plan/target projection).

Production > Post-calculation

Batch calculation

Post-calculation of several work orders at the same time. Results are saved in lists and there is no structure information available.

Production > Post-calculation

Valuation

With the respective setting the post-calculation can be used for valuing the assemblies to be posted in. See Configuration wizard > Production > Valuation of assembly.

 

Differences compared to pre-calculation:

Function

Pre-calculation

Post-calculation

Calculation of tools costs

available

not available

Extended resource cost rates

not available

available

 

Also see:

Batch post-calculation

Projection of actual costs

WO post-calculation

Configuration Wizard

youtube Product cost determination

youtube Webinar: Financial accounting in beas Manufacturing

 

 


Help URL: https://help.beascloud.com/beas202102/index.html?postcalculation_concept.htm