Dispatches

Production > Resources > All resources > Dispatches

Top  Previous  Next

In this window all reserved times are displayed for one or several resources.

PATH: see All resources tab.

Dispatches_2022.06

Window stamm_arbplatz_einlastung_kom.psr

 

The list can be set up dynamically. window settings, templates are supported.

If the respective fields are activated, you can display e.g. the already reported and open quantity.

 

Resource groups:

For a resource group, dispatches of the group and of all single resources of that group are displayed.

 

Display several resources:

Displaying several resources, they can be grouped. Separator bars can be displayed or hidden.

 

Interruptions

Interruptions are also displayed. These have the document number 0. No interruption can be calculated because interruptions have no shift definitions. That is why the indicated time is always 0.

 

Result information

This list displays the result of capacity planning.

Time is the current reserved time for this work position. If no time was reserved, the column is empty.

 

Functions

Button

Description

Detail

Detail view of all dispatches including interruption times. Only the currently selected resource is displayed.

Graphical view

Graphical utilization display.

Group bar

Switch on / off the separator bar.

 

see

Resources

All resources

Resource groups

APS Planning view