Sub view

Production > Capacity Planning, APS > APS Scheduling > APS Edit scheduling > Views > Views > Sub view

Top  Previous  Next
Expand/Collapse Toggles

APS Planning  

 APS edit Planing

         Master data

         Resources

         Views

                 View

                 Sub view

                 Field description

         Calculation type

 Planning view

 

Sub view

Grouping, sorting and field descriptions are defined in the sub view.

The sub view can be changed in Gantt without leaving it.

Production > Capacity Planning > APS > Add  > Views tab > Add or Open > Sub views tab > Add or Open

APS_Subview_setup_SAPStyle

 

Field

Description

Name

Name of the sub view.

Default work order view two tier

Set the standard sub-view as default instead of the one defined in the grouping area. If this field is enabled, all previous information saved in the grouping area is replaced by the standard sub-view parameters.

Type

Define whether the view is “Resource” or “Order” type.

Description

Description of the sub view.

Note: The text in the description is displayed later in the selection list in the graphical view. As a recommendation, do not select a long description, as the selection list can only display a limited number of characters.  

Time line

Determine whether the graphical view should be displayed in hours, days, weeks, months or years. By default, Beas sets this with the value “Day”.

Scaling

Set the scaling factor based in time units. This factor is taken into account in the time line scaling (Time units per mm. Set to1000 by default).

Zoom Display

The total Gantt-display can be decreased / increased. (Display in percentages.)

Dispatch Display

If enabled, graphically displays the utilization of the resources in addition to the graphical display of work orders in the Gantt view.

Resource Display

If enabled, graphically displays the reservation of the resources in addition to the graphical display of work orders in the Gantt view.

Important: Since the available space is limited, the user should only activate what is really needed.

Grouping

If a grouping has to be done. A grouping can totally be done on two levels, e.g. Resource group - Resource or Document - Document Position or Project - Document number.

Grouping by

 

Sort by

Sort criteria of the group

Total bar

If a total bar has to be displayed for the grouping (gray bar above the process). This bar is only useful in a order oriented view.

darstellung_summenbalken

Example with display of a total bar

Sorting in group

Determine the sorting in a group

Field

Sum1

Sum2

tooltip

After the mouse has been placed on an operation sequence but no mouse click has been done, a tooltip opens automatically. The resource as well as the information to this operation sequence are displayed there.

 