Resources tab

Production > Capacity Planning, APS > APS Scheduling > APS Edit scheduling > Resources

Top  Previous  Next
Expand/Collapse Toggles

APS Scheduling

 APS edit Scheduling

         Master data

         Resources

         Views

                 View

                 Sub view

                 Field description

         Calculation type

 Scheduling view

 

Resources filter

Define the filter on resource level here. This is active if at least one entry has been selected.

The resources are displayed by resource group + resource ID or resource optimization sorting if this function is enabled for this resource group.

The filter has the following meaning:

 

Display all work order positions if the resource was stored somewhere in the work order on routing level.

APS_sched_standard_Res

Window fert_xgantt_planing_ressource.psr

 

Column

Meaning

OK

Activate to select this resource.

Resource

Resource ID.

Description

Resource ID.

Group

Resource belongs to the indicated resource group .

Resource Group

This resource is a resource group.

Employee

Responsible employee.

 

Functions:

All Mark: By clicking on this button, you can easily select all resources to be considered for the scheduling.
Delete flag: Click on this button to clear all the existing checks for resources.

 

Note:

The belonging resources also have to be selected if a resource group has been selected

Parallel or alternative resources are not considered.

 

TOOLS:

Important: The system calculates interruption time ONLY for resources. Tools do not have a precalculated calendar, and Beas does not check interruption on Tool level.

 

hmtoggle_plus1  Always searched on WO level

hmtoggle_plus1Adjust of the resource filters

 


Help URL: https://help.beascloud.com/beas202402/index.html?resources.htm