Quick Input

Terminal and WEB APP > Terminal > Production apps > Quick Input

Top  Previous  Next
Expand/Collapse Toggles

T_D_Quick_input     DTerminal_QuickINPUT_2023.04

Available with Production Data Collection, Start, Interrupt, Completion, Finished Goods, Scrap license.

See Terminal settings in Configuration wizard.

 

This app opens the Quick Input tab of the Production Time Administration window in a separate window.

The Quick Input tab is used to report several time receipts in a list form.

All fields available at the time receipt are also available in quick input but in a grid format. Each row is a time receipt and the columns are the fields.

For field descriptions see Production Time Receipt.

 

Several lines can be added with the required information and then the information is added to the database when the confirmation buttons are used.

 

PATH: Production > Factory Data Capture > Production Time Administration > "Quick Input" tab.

Prod_Time_admin_Quickinput_SAPStyle

Window fert_arbzeit_schnellerfassung.psr

 

Button

Description

Cancel

Closes the window without any action.

Add

Adds a new line.

Delete

Removes the selected line from the list.

Confirm partly

Part confirmation for all entered operations or complete confirmation if in the Close column a check mark was set.

Confirm completion

All operations on the provided list are posted and closed.

 

Important: Parallel calculations and the automatic division of the reported times to resources does not work from this window. The time receipt must be created in the terminal. This setting is available in Configuration Wizard > Production > FDC > Parallel calculation.

 

Field

Description

Booked

Check mark is displayed when booked.

Pers.No.

Employee number of  person reporting the time receipt (setup in Attendance > Personnel ).

Name

Name of the employee.

Default branch

Default branch of the item.

Barcode

Bar code printed on the work order document (see Routing > position > extended > Barcode ).

Production

Work order number.

Document

Work order of the previously selected document.

Position

Position of the work order document.

Op. sequ.

Operation to be reported.

Pos 2

Parallel resources of the operation (previously resource pos).

Activity

Reported activity.

Resource

Cost type

Cost type on which costs are to be booked.

Cost center

Cost center to be charged (Business performance).

Time type

From Date

Start date.

To Date

Date of valuation.

From time

Start time.

To time

End time.

Duration

Duration of work order time. Can be changed after calculation.

External price

External price.

Valuation date

Valuate to the specified.

Closed

Shows if the operation closed.

Quantity yield

Produced quantity that is free from defects.

Quantity yield RE

Entry quantity in entry units, defined in operation. See Production – Routing – Extended – Time receipt unit.

Scrap

Scrap quantity in reporting units.

Unit

Quantity unit.

Item

Item number.

Information

Additional information.

Drawing number

Optional field.

 

back to production times administration


Help URL: https://help.beascloud.com/beas202402/index.html?terminal_quick_input.htm