Affects the minimum purchase quantity and the order multiple of an assembly. See Item master – Planning data
Minimum order quantity is always considered.
Affects the function requirement coverage calculation only. Only material and the sub-assemblies of the assembly which has multiples orders are affected.
If a subsequent requirement originator is covered by the multiple order of the predecessor, the subsequent pegging gets the same order proposal date.
See Example 3.
Note: Sub-assemblies and material requirement are combined in this case. In the Origin of requirement function the requirement coverage is displayed in a note.
See Requirement coverage calculation
Example 1:
Assembly A (order multiple = 50)
Assembly B ( = BoM of Assembly A, not order-related)
Sales order 1 for "Assembly A" 30 pcs
Arising requirement:
"Assembly A" from sales order 1 = 30 pcs
"Assembly B" from sales order 1 = 30 pcs
Example 2:
Sales order 1 for "Assembly A" 30 pcs
Sales order 2 for "Assembly A" 5 pcs
Arising requirement:
"Assembly A" from sales order 1 = 30 pcs
"Assembly A" from sales order 2 = 5 pcs
"Assembly B" Total 50 pcs
"Assembly B" can cover 2 sales orders because of this setting in the parent item.
Example 3: Order proposal date
Assembly A, Minimum order quantity is10, no stock, cycle time is 1 day.
Forecast 7. January: 4 pieces, order proposal: 6. January
Forecast 8. January: 4 pieces, order proposal: 6. January
Forecast 9. January: 4 pieces, order proposal: 8. January
Forecast 7: temporary 10 pieces are produced until January 6th. Forecast 8 is completely covered and Forecast 9 partly. From Forecasts 9, 2 pieces remain. More needs to be produced, accordingly a new date is calculated and displayed.
Note: refers to versions from beas9.1-004-058
Example 4:
With minimum order quantity and without multiple order:
Assembly A (Minimum order quantity = 50)
Assembly B ( = BoM of Assembly A, not order related)
Sales order 1 for "Assembly A" 30 pcs
Sales order 2 for "Assembly A" 5 pcs
Arising requirement:
"Assembly A" from sales order 1 = 30 pcs
"Assembly A" from sales order 2 = 5 pcs
"Assembly B" Total 50 pcs
Example 5:
With minimum order quantity and without multiple order:
Sales order 1 for "Assembly A" 30 pcs
Sales order 2 for "Assembly A" 5 pcs
Arising requirement:
"Assembly A" from sales order 1 = 50 pcs
"Assembly A" from sales order 2 = 5 pcs
"Assembly B" from sales order 1= 50 pcs
"Assembly B" from sales order 2 = 5 pcs
No summary, because Assembly "B" is produced with minimum order quantity of 50 and covers sales order 1.
The date is also considered. For additional information, see Requirement coverage calculation
Attention: MRP2 - Resource planning: Summarized values are displayed as a forecast.
NOTE: If there is a lower level item that has requirements from different parent items and these parent items have Multiple orders or minimum order quantity, it is recommended to enable this parameter.
|