Work order must be set to planned
|
Logon via pool report or terminal is possible only if work order has been set to planned.
|
Operation may not be closed
|
If you deactivate this option, it has the following effects: Work Orders - Expand, right mouse-click on a work sequence (green line): Selection "Time Receipt" is also displayed if the work sequence is completed.
Production Time Administration - new Message: No Time Receipt but a blocking message appears at selection of a completed work sequence.
Time receipt through "new receipt > bar code"or by Production Time Administration – Quick Input: The Input is possible without a further error message. Through Logon/Logoff – Open Work Order: It is generally not possible to register completed work sequences.
|
|
Material Inventory Test at Login
|
Info: If the inventory is insufficient, a message is displayed.
Required: If the inventory is insufficient, the operation cannot be logged on.
No (default): No inventory check is performed.
For setup reporting, no inventory check is normally performed.
|
Time receipt only during presence
|
Enabled: It is only possible to log on and off when the attendee does not apply for activity tracking. As long as work orders are logged on, the employee cannot leave.
See App "Leaving"
Variable: bde_nur_anwesend, Default=N
|
Attendance logoff: automatic logoff Work order
|
After attendance logoff from terminal, all work orders of the current user are automatically logged off, as well.
|
Previous op.sequ. must be completed
|
Note:
Only the preceding reportable operation is checked.
Affected: App "Logon order" and all extensions using this logon-object.
Not affected: function "Report time receipt"
Example
10 mandatory
20 not mandatory
30 mandatory <- if you want to make a receipt, the position checks Pos 10
10 not mandatory
20 mandatory <- if you want to make a receipt, the system does not check previous positions
|
|
Previous routing position with quantity confirmation
|
Enabled: Logon is only possible if a quantity was reported in the preceding routing position.
10 mandatory
20 not mandatory
30 mandatory <- if you want to make a receipt, the position checks Pos 10
10 not mandatory
20 mandatory <- if you want to make a receipt, the system does not check previous positions
|
|
Previous QC must be OK
|
1. Does the inspection plan exist for this position?
2. Are all samples okay?
If the answer to both is not Yes, you cannot log on to the subsequent position.
In this case, an error message is displayed:
Error message ID: afoanmqs9435
"(afoanmqs9435) In work sequence 20 the QC-inspection has not yet started. Registration is not possible!"
Example
10 mandatory
20 not mandatory
30 mandatory <- if you want to make a receipt, the position checks Pos 10
10 not mandatory
20 mandatory <- if you want to make a receipt, the system does not check the previous positions.
See
Configuration wizard – QC-create new
Quality control – Concept
Routing
|
|
Confirm at least previous quantity
|
The rule takes effect only from the second operation sequence.
Example 1: Operation sequence 1: reported 10 yield, 5 scrap.
Confirmation on the second operation with option enabled.
Report 5 yield-> blocked. At least 10 need to be confirmed.
Report 5 yield, 5 scrap -> : OK, minimum quantity of 10 is reached.
Example 2: Operation sequence 1: report 5 yield, 0 scrap.
operation sequence 2: report yield 4, 1 scrap -> OK.
operation sequence 1: another 3 reported, 0 scrap.
Confirmation on the second operation with option enabled:
Minimum quantity according to operation sequence: 8.
Already posted to 2nd operation: 5 (4 yield, 1 scrap).
Minimum quantity for the next posting to the operation sequence 2 : 3 pieces.
It is recommended to combine this option with "maximum previous quantity reportable".
|
|
Confirm at most previous quantity
|
If nothing has yet been reported in the previous position or if the corresponding quantity was already reported in this position, the yield quantity input field is blocked.
This check does not refer to the first confirmable operation sequence, but only to the subsequent one. It determines whether not more than the quantity of previous operation sequence may be confirmed.
Yield and scrap quantity is taken into account.
Example:
Operation sequence 1: confirmed 10 yield, 3 scrap.
Operation sequence 2: confirmed 5 yield, 3 scrap.
For operation sequence 2 only 2 remaining pieces may be confirmed.
Affected: work order time registration and external operation - collective purchase.
Note: If the previous routing position is an external resource, the quantity is the sum of purchase-order goods-receipt quantity, minus the quantity reported in the purchase goods returns.
Attention: If the maximum quantity is exceeded, an error message is issued:
"(maxqty0243) Maximum purchase quantity exceeded! (Max. quantity due to time receipt of preceding operation)"
|
|
Max. planned quantity reportable
|
This refers only to the first confirm able operation and determines whether as maximum only the planned quantity may be produced. Scrap is not taken into account.
Example: planned operation sequence of 10 pieces.
1st confirmation: 8 yield, 2 scrap.
2nd confirmation: only 2 additional pieces are permitted.
This check is only performed when creating a new order-related time receipt, not when changing an existing receipt. It takes place at the moment the time receipt is saved.
|
|