A QC plan can be stored in a work sequence. Choose at which moment the QC order should be created:
Manually: Only manual creation
At time receipt: Creating during the first "Time receipt"
At login to work order: Creating during the first logon (not the first time receipt)
Production create: At new creation of a work order (beas9.0-000-003-001)
External operations
If dealing with an external operation, the option is supported.
At order logon: Creating a purchase order.
At time receipt: Creating goods receipt.
Note: for external operations, there is no link from the QC order to purchase or goods receipt. Only a link to operation. That means there is always only one QC order per operation with any number of samples. A dependency from external operation-goods receipt cannot be created.
See
Routing
Production – operation sequence
Quality control order
(Variable fert_qsanlage, m (default) = manually, r = at time receipt, s = at order logon, c=at new creation)
|