FDC

Administration > System Initialization > Configuration Wizard > Production > FDC

Top  Previous  Next
Expand/Collapse Toggles

Factory Data Capture (FDC) is a functionality to register production time and quantities.

PATH: Administration > System Initialization > Configuration wizard > Production.

 

Parameters

Parameter

Description

Time Linking

Attendance linking

Parallel calculation

 

Allow closing of operation sequences

If yes, the employee can close a work order via a terminal – even if there are quantity shortfalls.

Close operation sequence automatically

Security query at last working position

Activate security query if last operation has been received and assembly is posted in.

See Report production times

Login to work order: multiple login

Time distribution Master-Slave

Master-Slave not at Manual Message

Order time receipt: Protocol

If enabled, at new creation, change or deletion (in this case a cancellation)  a protocol is always created, even if there are no costs to be booked.

Material tracing based on operation

Preliminary test entry in journal

Cost center determine by


Help URL: https://help.beascloud.com/beas202402/index.html?bde3.htm