Sub-assemblies are not broken down but calculated as purchase parts; phantom assemblies are broken down.
Depending on the switch "value depending assemblies" (see below) sub-assemblies are always valued first.
Calculation item area A-C.
Assembly A contains a subassembly B which again includes a subassembly C.
First the assembly C is calculated, then B and A as last.
|
The subassembly is valued with the value indicated in "Price list" - "with reference to". If the subassembly was not valued before, the price according to "pricing" is used.
Calculation item area A-B
"value depending assemblies" disabled.
Assembly A contains a subassembly B which again includes a subassembly C. First, assembly B is calculated, C is valued according to "pricing" like material.
Assembly A is calculated as last, for valuation of B the calculation result is used - according to the setting "with reference to".
|
Note:
If you use "One Step", the result can be different than when the option is disabled.
Reason: if you work with one step, the system calculates the sub-assembly with all costs from the calculation schema. The main item uses this result in its Bill of materials and adds the costs of calculation schema at the end again.
If disabled, the system calculates the complete structure and adds costs from the calculation schema once.
Note:
If purchase parts are included in the batch run, the calculated price of the purchase parts is used as reference for material valuation when calculating the assemblies.
Field: onelevel (1=on, 0=off - Standard)
|