The sequence of processing as well as the throughput time of the work orders is controlled via priorities.
PATH: Administration > Setup > Production > Priority.
Priorities affect capacity planning including throughput time calculation, as well as pool control.
Window basis_prioritaeten_browse.psr
You can use Window settings and Templates for the configuration.
In Item and in Work Order a priority can be stored. The higher the number, the higher the priority is. If a priority is stored in the order, it has precedence.
In case of multilevel calculation, the priority is passed on to the demand items.
Field Description
|
|
Priority
|
Unique identification of the material group.
|
Information
|
Arbitrary text describing the priority.
|
Utilization %
|
The greater the value the greater the throughput time is.
Example:
If the resource has 8 hours for 1 machine, a utilization of 120% means that the machine can be scheduled for max. 9.6 hours for this order per day.
See Expand and compress.
Note: If this is not 100%, the system uses calculation method Exploit full capacity.
|
|
Transit time %
|
The corresponding default is used if set to 100%. The transit time can be reduced by minimizing the % amount and it can be maximized respectively.
The following applies: The smaller the percentage value is, the faster the throughput will be.
Example:
At a defined transit time of 6 hours and 50% transit time, a time of 3 hours is calculated.
see Transit time
|
|
Pool Factor
|
Basic rule: The higher the pool factor is defined, the higher the priority is.
The sort order can be controlled using the pool factor.
Simply enter a very high number here for instant orders.
See
Introduction Pooling
Function Pooling, Scheduling
|
|
Immediately
|
If this option has been activated, the order always has first priority, regardless of whether it can be produced.
|
Functions
Function
|
Description
|
Add
|
Add a priority line to edit.
|
Remove
|
Remove selected priority from the list.
|
Change Log
|
Open the Change log to see a history of changes.
|
You can define the default priority in Configuration wizard > Production > Create.
Help URL: https://help.beascloud.com/beas202402/index.html?prioritaten.htm
|