Pool report

Administration > System Initialization > Configuration Wizard > Production > FDC > Pool report

Top  Previous  Next
Expand/Collapse Toggles

PATH: Administration > System Initialization > Configuration wizard > Production > FDC

 

In the pool list you can see all fields of the routing positions of an assembly and the work order. Window settings and Templates are supported.

 

Configuration for Pool List

Production > Factory data capture > Terminal > Pool Report

Pool_report

Window bde_terminal_poolinfo.psr

 
Parameters

Parameter

Description

Pool report with material check

Pool list: show only planned WO

Direct logon logoff

If this option is enabled, one or more parallel work sequences are logged on and off in the pool list. The multiple selection feature is activated hereby. Multiple logon is only possible if permitted by the stored rules.

Dispatching index: Consider number of days

The default value is 99. Limits the number of days displayed in the pool report.

Note: If you do not work with APS, insert a number between 10-99, otherwise you will not be able to see all Routing positions.

 

 

See:

Pool Control

Capacity planning

Priorities


Help URL: https://help.beascloud.com/beas202402/index.html?poolliste.htm