Calculation schema
|
Defines which Calculation schema to use to calculate this item. See Calculation Schema.
|
Lot Size
|
You can define the Lot size in Production or Inventory UoM. Default is Production UoM.
|
Material Valuation
Material Valuation 2
|
Determine the source for the direct material costs.
Material Valuation 2 determines the source for the direct material costs in case any of the direct material costs is not found in the source set in Material Valuation.
This setting has no effect on External operation > Valuation of services.
The default schema is defined in the Configuration Wizard.
See Setup wizard – Calculation – Costing analysis and Pricing types.
|
One step
|
If activated, only a single-level of Precalculation is performed, that is, sub-assemblies are not further broken down. If not selected, the complete BoM structure is broken down.
Sub-assemblies are valued according to the selected method.
|
Display per
|
•Display per piece (or unit) shows the calculated values for one piece.
•Display per lot size (corresponds to calculation lot size) shows the calculated values for the amount of pieces set in the Lot size field.
•Display per .. (factor can be entered manually) shows a new field to set the quantity of pieces for which to display the calculated values.
You can define "Lot size" and "Display per" with decimal places.
|
|
I-Version
|
|
Variant
|
Select a specific variant for running the calculation process. Up to 26 variants can be stored per item.
|
Product configuration
|
Select a specific product configuration for running the calculation process.
|
Bill of Materials
|
The BoM to be used for the breakdown of the assembly can be selected in this field. It is stored in the item or item version.
This fields is only visible if Item version control was activated.
|
|
Routing
|
The Routing to be used for breakdown of the assembly can be selected in this field. It is stored in the item or item version.
This fields is only visible if Item version control was activated.
This field can be edited only when creating a new calculation and and the Routing directly selectable option is enabled.
|
|