Alternative materialInventory > Bill of materials > Edit BOM > BOM positions > Alternative material |
Top
Previous
Next
|
You can insert alternative materials in the BoM of each item. You can define for example, that instead of 1 item of type A, 2 items of B may be used. If a BoM position is opened, with right-click on the item number the item can be replaced.
PATH: Inventory > Item master data > Bill of materials tab > right-click a BoM position > select "Alternative material" WIndow artikel_stlpos_alternativ.psr
Field descriptions
If you have deposited alternative items, these are displayed in the tree view with the replacement-icon. Click on this icon to open the selection screen in which alternative items are displayed. If you select a position, the item and the quantity is changed in the BoM.
Alternative material is displayed directly in the work order structure view as well as in the item structure, if the position is not completed and proper editing rights are granted. The item can be changed directly. Here, the quantity and the material is exchanged. Important: - If the exchanged material is an order-related assembly, there is no resolution of its material. - Item Version current not supported
See
|