Post-calculation cost centersProduction > Post calculation > Post-calculation results > Post-calculation cost centers |
Top
Previous
Next
|
Post-calculation creates an evaluation on cost centers at the same time. Accessible in post-calculation via "cost centers".
Post-calculation - Master data Post-calculation - Details on calculation
PATH: Post calculation > Results > Cost center button
Determination of cost centers by following rules:
Operation: planned cost center as per resource (Field cost center in resource master). Material: cost center as per material master, field "Profit center“. Order time receipt: cost center as per time receipt.
Settings of cost center determination in Configuration wizard. Production > FDC > Determination of profit centers "Resource" or "Assembly". Production > Material posting > Account settings > Determine profit center via "Material" or "Assembly" or "No" (= Standard, no determination)
See |