Resources tabProduction > Capacity Planning, APS > APS Planning > APS Edit Planning > Resources |
Top
Previous
Next
|
Resources filter Define the filter on resource level here. This is active if at least one entry has been selected. The resources are displayed by resource group + resource ID or resource optimization sorting if this function is enabled for this resource group. The filter has the following meaning:
Display all WO positions if the resource was stored somewhere in the WO on routing level. Window fert_xgantt_planing_ressource.psr
All Mark: By clicking on this button, you can easily select all resources to be considered for the scheduling.
Note: •The belonging resources also have to be selected if a resource group has been selected •Parallel or alternative resources are not considered.
TOOLS: Important: The system calculates interruption time ONLY for resources. Tools do not have a precalculated calendar, and Beas does not check interruption on Tool level.
|