Material per
|
Determines the number of finished parts the quantity specification refers to in the BOM position. For "each 1000" and a quantity of 5 pieces in the BOM position, 5 pieces are required per 1000 finished parts.
|
Accept Changes
|
"Material per" is entered in the master data and current production.
This function must not be carried out in running operation.
|
Pos. Increment
|
During the creation of Bill of materials, the position numbers are generated automatically. The increments are entered here – Default is 10.
|
Name Info Field
|
There is a freely usable field available in the Bill of materials, called "Info". It can be renamed here.
|
Name UDF 1 .. UDF4
|
Additional freely usable field. Only visible when a name was issued. See UDF.
|
Accept illegal Item numbers
|
NOTE
It is not recommended to use this option. It is available only for compatibility reasons and will be removed in the next version.
Use template (default) items instead.
|
|
Item, if unknown
|
If no item was created for a BOM position or no item shall be created, you can use a replacement item. Description and drawing number can be entered manually.
Using the import program, this item will be used automatically. If no item was defined, the BOM cannot be imported.
If a new BOM position is registered and the item defined here was inserted, the switch "manually" will be displayed.
Beas 9.1 PL:08, Variable st_bomtemplate
|
|
Scrap Calculation procedure
|
The formula to be used for the Material Scrap in Bill of Materials can be selected here.
You can select between two methods to calculate the BoM Scrap.
Scrap = Quantity * ( Scrap % )
Scrap = Quantity / ( 1 - Scrap%/100 )
Default is first option (same function as in the past). In this way you will not lose compatibility to older versions.
More see Scrap field in Bill of Material
|