Production > Resources > Edit resource > Extended tab
PATH: see "Edit resources".
Field
Meaning
Lot size Minimum / Maximum
Minimal and maximum lot size, e.g can be used in variant production for further calculation.
Personal allowance and recovery time %
Factor for global portion of planned times.
These fields are used for the calculation of the Determination of secondary time.
See
Concept type times
Configuration wizard – Resource – Time types
Picture
An additional picture can be selected to represent the resource.
Color
Select a font color in which the resource will be displayed in work order structure view. Independent from color setting of operation type.
back to edit resource