Bill of Materials Position

Administration > System Initialization > Configuration Wizard > Master data > Bill of Materials > BOM position

Top  Previous  Next
Expand/Collapse Toggles

PATH: Administration > System Initialization > Configuration wizard > Master data > Bill of materials > Bill of materials Position.

 

Parameters

Name

Description

Material per

Determines the number of finished parts the quantity specification refers to in the BoM position. For "each 1000" and a quantity of 5 pieces in the BoM position, 5 pieces are required per 1000 finished parts.

Accept Changes

"Material per" is entered in the master data and current production.

This function must not be carried out in running operation.

Position Increment

During the creation of Bill of materials, the position numbers are generated automatically. The increments are entered here – Default is 10.

Name Info Field

There is a freely usable field available in the Bill of materials, called "Info". It can be renamed here.

Name UDF 1 .. UDF4

Additional freely usable field. Only visible when a name was issued. See UDF.

Item, if unknown

Scrap Calculation procedure

The formula to be used for the Material Scrap in Bill of Materials can be selected here.

You can select between two methods to calculate the BoM Scrap.

Scrap = Quantity * ( Scrap % )

Scrap = Quantity / ( 1 - Scrap%/100 )

 

Default is first option (same function as in the past). In this way you will not lose compatibility to older versions.

For more information see Scrap field in Bill of Materials.

 

See BoM