Position
|
Unique position number – normally in increments of 10 to add subsequent positions. This number also serves as sort criterion for the terminal display.
|
Type
|
Selecting the resource type with a right-click.
|
Resource
|
Designation of the resource – depending on the type selection, the resource can be selected with a right-click.
|
Description
|
Designation of the resource – is automatically carried forward after selecting the resource.
|
Quantity
|
Overall demand of the resource, e.g. number of tools.
|
Setup time
|
The setup time in 'per' according to the field "Time per".
|
Mach+Labor Time/unit
|
The mach+labor time in 'per' according to the fields "Time per" and "Quantity per".
|
Additional Info
|
Any additional information displayed at the FDC terminal of a tool.
|
Utility factor
|
The utility factor – the inverse of work steps. See Calculation of target time.
Example: By sawing a board apart, the material is provided for two finished goods - the utility factor is thus 2.
|
Number factor
|
The opposite to the utility factor.
Example: Two steps are necessary to produce a part. The time per 1 cut is stored, the quantity of the required cuts is stored with number.
|
Quantity per ..
|
The requirement time is specified for each number indicated here per assembly to be produced.
Example: For 1000 the time is per 1000 finished parts.
|
Time by
|
Times are specified in hours or minutes.
|