Precalculation extended viewSales - AR > Precalculation > Pre-calculation extended view |
Top
Previous
Next
|
With the "Precalculation extended view", all results of the calculation schema can be displayed per assembly in a horizontal arrangement.
PATH: Sales – A/R > Precalculation > Add > select "View" tab. > click "View Extended" button.
Window pk_struktur.psr
Top bar function icons in Boyum Style design:
To see the desired cost objects in the Extended view, the following steps are required: 1. Select a Calculation schema for the calculation.
2. Enable "Calculating surcharge for sub-positions" in the Calculation schema.
3. Define values to be displayed in Calculation schema > Display tab.
4. Add item(s) with the "Insert item" button from the header. 5. Switch to "View Extended" in the Precalculation > View control bar.
Example: In our example (see above: Image 1.) we are displaying the precalculation details for two assemblies – the two versions of the item "VA-Level2-Sep".
See: Beas Calculation per Assembly Webinar
See Calculation schema – Surcharge calculation per item Precalculation – Extended view
back to Precalculation |