Here you can define how the BoM and routing are linked to the item.
Only editable if an Item, a batch, or serial managed item and a Version is defined.
Default = ID of BoM and routing are the same as the item ID.
Extended view = like default, but in structure view the BoM / routings are displayed per version. This setting affects only the display.
Separate BOM = Item ID, BoM ID and routing ID can be different. In the item version you store which BoM is to use for the item and for the version. In the BoM you define which routing to use.
To activate this field:
1. Click icon right of Item Version – open list of all Item Versions
2. Define a version and go back to the item window
3. Choose the Administration (this field) and update the window. Now full functionality is available for this item.
|