Advanced Scheduling

Inventory > SAP Item Master Data > Advanced Production > Advanced Scheduling

Top  Previous  Next
Expand/Collapse Toggles

This section of the Advanced Production tab includes Beas fields associated with MRP scheduling.

 

Advanced_Production_Adv_Sched

 

Field

Description

Accumulation

Priority

MRP runs can be sorted by priority. If a material has a high priority and a requirement, the requirement-originating assembly also receives the corresponding priority.

You can configure whether a high or low number displays a high priority in the Setup Wizard (ascending or descending).

MPS

Activate if an item is scheduled via MPS.

 

 

back to Item Master Data


Help URL: https://help.beascloud.com/beas202402/index.html?advance_scheduling.htm