Executed while capacity calculation for every routing position after calculation of this position and after creating the time reservation table
Only Backward Calculation
Variable |
Read |
Write |
Description |
||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
e_Method |
x |
Calculation Method MRP Executed by MRP, ATP, CTP Workorder Executed manually from work order Or the Calculation Method, which defined in APS List |
|||||||||||||
e_MethodStep |
x |
In Method you can define more then one Step. This is the Step. First step is 1 |
|||||||||||||
e_DocEntry |
x |
Work order document number |
|||||||||||||
e_LineNumber |
x |
Work order position number |
|||||||||||||
e_LineNumber2 |
x |
Routing Position |
|||||||||||||
e_BaseDocEntry |
x |
Base document, example Sales order. Only in MRP |
|||||||||||||
e_BaseLineNumber |
x |
Base document line |
|||||||||||||
e_ItemCode |
x |
Calculated Item Code |
|||||||||||||
e_Quantity |
x |
Calculated Quantity |
|||||||||||||
e_CheckReservedTime |
x |
Check reserved times |
|||||||||||||
e_RoutingSplitt |
x |
Allow Routing Split true/false |
|||||||||||||
e_Simulation |
x |
Simulation true/false |
|||||||||||||
e_CalcSaveType |
x |
Save type
|
|||||||||||||
e_ReservationType |
x |
||||||||||||||
e_Resource |
x |
x |
Resource Id If you change resource, the system make only the time reservation on this resource, but don't change the resource on routing position |
||||||||||||
e_TimeLine |
x |
x |
Time line in format yyyy/mm/dd hh:mm Backward: The End Date Forward: The Start Date
Note: The time line is between transit and idle time in forward calculation you can go only forward in time line in backward calculation you can go only backward
|
||||||||||||
e_Duration |
x |
x |
Duration in minutes |
Every Date must have follow format: yyyy/mm/dd hh:mm
If you use another format, then the system don't save the value in correct way.
NOTE:
The system don't check the changes. If you change any parameter, you must check all / calculate other parameters too.
The system save the changes in Work order routing position, but this don't have effect to time reservation table BEAS_RESOURCEN!