Executed, if you start the calculation in APS list
This is executed for every work order position for every work order position step
You can cancel the step and you can manipulate it
Variable |
Read |
Write |
Description |
---|---|---|---|
e_Method |
x |
|
Calculation method Id |
e_MethodStep |
x |
|
Calculation step (Step number from Calculation method) |
e_DocEntry |
x |
|
Work order document number |
e_LineNumber |
x |
|
Work order position number |
e_CheckReservedTime |
x |
x |
Check time reservations: "true" or "false" |
e_RoutingSplitt |
x |
x |
Allow to splitt times: "true" or "false" |
e_FixLoggedIn |
x |
x |
Fix routing positions to current date/time, if worker current working on it "true" or "false" |
e_CheckPurchaseOrder |
x |
x |
Check purchase date for delivery |
e_PurchaseOrderTime |
x |
x |
Define delivery time for purchase order in format hh:mm (24 hr), example "15:00" |
e_Direction |
x |
x |
Calculation direction. 1=Forward, -1=Backward |
e_Simulation |
x |
x |
Calculate only as simulation: Don't save the result in time reservation table. "true" or "false" |
e_CheckMaterial |
x |
x |
Check date of availability of needed Material (only, if material check is activated) |
e_TransitionTime |
x |
x |
Transition Time in Percent , example "50" for 50% |
e_OverLoading |
x |
x |
Overloading in Percent |
e_ExecuteRule |
x |
x |
Define execute rule 1 = Calculate end date > work order delivery date 2 = Calculate start date < work order start date |