Executed after the calculation of a Routing position
After the definition of time reservations
Before saving result in a work order routing position
HERE you can manipulate the time line for next routing position.
Only Forward calculation

You can manipulate the time line "e_TimeLine" and Duration
Variable |
Read |
Write |
Description |
||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
e_Method |
x |
Calculation Method MRP Executed by MRP, ATP, CTP Workorder Executed manually from work order Or the Calculation Method, which defined in APS List |
|||||||||||||
e_MethodStep |
x |
APS In Method you can define more than one Step. This is the Step. First step is 1 |
|||||||||||||
e_DocEntry |
x |
Work order document number |
|||||||||||||
e_LineNumber |
x |
Work order position number |
|||||||||||||
e_LineNumber2 |
x |
Routing Position |
|||||||||||||
e_BaseDocEntry |
x |
Base document, example Sales order. Only in MRP |
|||||||||||||
e_BaseLineNumber |
x |
Base document line |
|||||||||||||
e_ItemCode |
x |
Calculated Item Code |
|||||||||||||
e_Quantity |
x |
Calculated Quantity |
|||||||||||||
e_CalcSaveType |
x |
Save type
|
|||||||||||||
e_CalcType |
x |
Calculation Type
|
|||||||||||||
e_Direction |
x |
Current calculation direction 1 or -1 |
|||||||||||||
e_TimeLine |
x |
x |
Current Time Line. Next Routing position start /end from this time line |
||||||||||||
e_Duration |
x |
x |
Duration in Minute |
||||||||||||
e_Start |
x |
x |
Total Start |
||||||||||||
e_TransitStart |
x |
x |
Transit Start |
||||||||||||
e_TransitEnd |
x |
x |
Transit End |
||||||||||||
e_ResourceStart |
x |
x |
Resource Start |
||||||||||||
e_ResourceEnd |
x |
x |
Resource End |
||||||||||||
e_IdleStart |
x |
x |
Idle Start |
||||||||||||
e_IdleEnd |
x |
x |
Idle End |
||||||||||||
e_End |
x |
x |
Total End |
Every Date must have the following format: yyyy/mm/dd hh:mm
If you use another format, the system will not save the value correctly.
NOTE:
The system does not check the changes. If you change any parameter, you must check all / calculate other parameters too.
The system saves the changes in the Work order routing position, but this does not affect time reservation table BEAS_RESOURCEN!