Production

Administration > System Initialization > Configuration Wizard > Quality control > Production

Top  Previous  Next

PATH: Administration > System Initialization > Configuration wizard > Quality control.

 

Parameters

Name

Description

Create QC Order automatically when

A QC plan can be stored in a work sequence. Choose at which moment the QC order should be created:

 

Manually: Only manual creation

At time receipt: Creating during the first "Time receipt"

At login to work order: Creating during the first logon (not the first time receipt)

WO creation: At new creation of a work order (beas9.0-000-003-001)

WO creation (Background): If the Beas Common Service is active, the creation process is moved to the service. (Beas 2025.06)

 

External operations

If dealing with an external operation, the option is supported.

At order logon: Creating a purchase order.

At time receipt: Creating goods receipt.

Note: for external operations, there is no link from the QC order to purchase or goods receipt. Only a link to operation. That means there is always only one QC order per operation with any number of samples. A dependency from external operation-goods receipt cannot be created.

 

See

Routing

Production – operation sequence

Quality control order

(Variable fert_qsanlage, m (default) = manually, r = at time receipt, s = at order logon, c=at new creation)

 


Help URL: https://help.beascloud.com/beas202506/index.html?fertigung7.htm