See all available resources and the current status. Use the buttons below to manage resources.
Resource Groups
All resources
Graphic resources
Edit resource
Note: Resource optimization for the resource group has to be enabled for this feature. ( Resource optimization)
PATH: Resources > Resource Master Data.
or
PATH: Resources > Resources.
Window stamm_arbplatzgruppe_browse.psr
Columns
|
|
Group
|
Name of the resource group.
|
Description
|
Free text.
|
Shift
|
Assigned shift from Shift schedule for resources.
|
Name
|
Employee.
|
From
|
Logged in since.
|
Interruption
|
Type of interruption.
|
Utilization
|
Displays planned capacity gray ( according to resource scheduling ) and currently dispatched capacity in green. The covered time period in utilization column is set up in: Configuration wizard > Production > Display > Structure view > Dispatching index: number of days to be considered.
|
Functions
|
|
Open
|
Opens master data of the selected resource: Edit resource.
|
Cancel
|
Closes the window.
|
New resource
|
Add a new resource.
|
Edit group
|
Opens the "Edit resource group" window.
|
New group
|
Add a new resource group.
|
Re-calculate
|
Recalculates the utilization.
|
Dispatches
|
- right-click option. Opens the Dispatches window .
|
Graphic utilization display
|
- right-click option. Opens graphic utilization display for the currently selected resource.
|
Resources cost rates
|
Define cost rates.
|
See:
Resources (Concept)
Dispatches
Resource shift schedule
Edit resource
Graphic utilization display