If a receipt is performed via Production or a quality control release is performed, the shelf life date is reset from release.
•if the first input field is blank, the second input field is used
•Counted from production date, if empty then from today
If a manufacturing date is entered in the goods receipt window, the date of expiry is calculated automatically (calendar days of shelf life are added to manufacturing date).
see Batches to be verified
|