Processing tab

Sales - AR > Precalculation > Edit Precalculation > Precalculation Controls > Processing tab

Top  Previous  Next
Expand/Collapse Toggles

This tab has the controls for editing the calculation.

 

The right-click menu can be called from any BoM or Routing line in the Precalculation structure.

Field

Meaning

Open

Edit the currently selected item (corresponds to double click on an item or push button "open entry")

 

Special feature: When editing the first entry, the window for calculation details opens.

This option is disabled if the calculation was called from item  master.

Insert Item

Opens a item selection window. The items selected  (and possibly their substructure) are inserted at the current position.

New assembly

Insert a new assembly, which does not yet exist in the item master.

New material

Insert a new purchase part, which does not yet exist in the item master.

Operation

Insert new operation for the material.

Tool

Add new tool to the selected operation.

Parallel resource

Add a parallel resource to the selected operation.

Alternative resource

Add an alternative resource to the selected operation.

Cut

Cut the selected position and its substructure. It will remain as long as it is not inserted at a new location.

Duplicate

Copy the selected position and its substructure.

Insert

Insert the previously cut or copied position.

Remove

hmtoggle_plus1 Delete row, structure or calculation

Calculate

Recalculate the entire calculation.


Help URL: https://help.beascloud.com/beas202109/index.html?processing-tab.htm