Dispatches detail

Production > Resources > All resources > Dispatches > Dispatches detail

Top  Previous  Next

Single time reservations of a resource are displayed, grouped by day. In contrast to the dispatches window, not only start/end end time, but also all interruptions are displayed. (a reason may be a reservation over several days, or a dispatch optimized for lead time). Other fields are available in Window settings.

 

Dispatches_detail

Window stamm_arbplatz_einlastungen_extra.psr

 

Field

Meaning

Document

General definition of resource.

Order

Work order number.

Position

Position in document.

Op. Sequ.

Operation position.

Resource

Resource ID.

From

Start time.

To

End time.

Time hrs

Duration.

Item

Item number.

Designation

Item designation.

Quantity

Quantity to be produced.

I-Version

Item version.

Drawing number

Drawing number.

 

back to dispatches

 