PATH: Resources > Resource Master Data> Select a Resource > Edit Group button.
Window stamm_arbplatzgruppe_edit.psr
Resource group Tab
Header
|
|
Group
|
Group ID.
|
Description
|
Description of the group.
|
Directly schedulable
|
If enabled, each resource of this group can be scheduled separately. You can assign an ID to the scheduling. This setting allows planning to the minute, but there are some risks.
|
Automatic optimization
|
If enabled, automatic optimization is used for the pre-selected resources of the resource group.
Double-click the icon to open the Optimization: Sequence window and select the resources to be optimized:
Window stamm_arbplatz_optimize.psr
|
With ID
|
|
Resources sub-tab:
All resources of the group are displayed with corresponding cost rates.
|
|
Resource
|
Number of the resource.
|
Description
|
Description of the resource.
|
Service/cost
|
Enable to consider the respective resource in scheduling.
|
Full cost rate
|
Full cost rate deposited in master data of the resource.
|
Marginal cost rate
|
Marginal cost rate deposited in master data of the resource.
|
Planned capacity
|
According to factory calendar (hours per day).
|
Empl./No.
|
Number of machines/ employees.
|
Group
|
Group ID.
|
Buttons:
Scheduling sub-Tab:
The factory calendar with registered capacities of the resource group is opened.
Window stamm_arbplatzgruppe_edit.psr
Utilization is displayed for each resource of the group.
Graphic sub-Tab