Compute resourcesInventory > Item structure > Item structure right click menu > Compute resources |
Top
Previous
Next
|
In this window, the material and resource requirement and the replenishment time can be calculated in advance for an assembly: artikel_resourcenberechnung.psr
This window can - Calculate lead time for item master data - Calculate Bill of Materials and Resource, which you need for fast forecast calculation in MRP - Create table for Material and resource with complete material and resource requirements
Which assemblies to calculate can be selected with filters on item, item group etc using a (AND)-conjunction
Calculation lot size: The calculation lot size is the "Lot size / production", defined in the item master data. Calculation date: Every calculation needs a delivery day. The system uses today + 100 calendar days as delivery day. It uses this day to check which Bill of Materials position or Routing position is active (Field Extended / Valid from / to). It uses the resource planning for the next 100 days. Calculation is standard backward calculation. If the resource calendar is not calculated, the system performs this automatically (beas 2020.02) Configuration/Variant System: Configurations and Variants (formulas and scripts) are ignored in the same way as in MRP. Short Variant: The system always uses the short variant A. I-Version: If item version is used, the system always uses the I-Version which was defined as default I-Version in item master data.
To perform the computation on a regular basis, you can create an activity.
See lead time and material requirement calculation Item structure right-click menu MRP – Planning scenarios – Detail – Forecasts |