In this column you can see the requirement.
For Plan Quantity the system calculates with the Rounding system.
Requirement = the calculated Quantity - Booked Quantity
The Requirement is not rounded again.
But if you PreAssign the quantities, the system rounds the result again.
Example:
Plan Quantity = 4.5, Round = multiple of 2. Requirement = 6
Issue document for 5 Pcs, Requirement is 1
Click on PreAssign: The system defines 2 Pcs, because it works with rounding "multiply of".
Why:
Example: You wor with pallets. Multiple is 1
You need 0.2 Pallets per Pcs.
But for every receipt + backflushing process you need a pallet and not part of a pallet.
This is the reason that the system MUST use the rounding concept for every partial receipt and related issue document.
|