Post-calculation cost centers

Production > Post calculation > Post-calculation results > Post-calculation cost centers

Top  Previous  Next

Post-calculation creates an evaluation on cost centers at the same time. Accessible in post-calculation via "cost centers".

 

Post-calculation - List

  Post-calculation - Master data

  Post-calculation - Results

      Post-calculation - Details on calculation

          Results profit centers

          Results detail

 

Post calculation - Results - Button Cost center

Postcalc_Results_CostCenter

 

Determination of cost centers by following rules:

 

Operation: planned cost center as per resource (Field cost center in resource master).

Material: cost center as per material master, field "Profit center“.

Order time receipt: cost center as per time receipt.

 

Settings of cost center determination in Configuration wizard.

Production > FDC > Determination of profit centers  "Resource" or "Assembly".

Production > Material posting > Account settings > Determine profit center via "Material" or "Assembly" or "No" (= Standard, no determination)

 

 

See

Post-calculation results

Post-calculation


Help URL: https://help.beascloud.com/beas202106/index.html?postcalc_profitcenter.htm