WO cancellation window

Production > Work order general > WO structure > WO Structure Material postings > WO cancellation screen

Top  Previous  Next
Expand/Collapse Toggles

PATH: Work order structure > raw material issue item_issue right-click > Cancellation BACKUP.

Cancel_Cancellation

Window mw_storno_browse.psr

Here the entire WO issue document can be canceled at once. The document is presented in its entirety – per batch, per serial number and per bin location on separate lines. The amounts can be pre-allocated or entered manually. Double cancellation is not possible.

 

Approach: The program performs a posting for the same price as the issue to the same account. A normal receipt document is generated.

Note: Using average price or FIFO valuation deviations can occur. With FIFO, in general no  cancellation with correct prices is impossible.

 

Note: This window is also opened, when scrap is posted back for re-use after issue. Therefore, setup in Configuration wizard under Production > FDC > View time receipts: Post back scrap material.

 

With serial numbers, the posting is done to the same internal number. There is no new serial creation. Prerequisite: The serial number was not manually posted.

 

Field

Meaning

Date

Cancellation date. Default: today; it is changeable.

Memo

Additional information, transferred to SAP Business One -document.

 

Column

Meaning

Document

Document number.

Line

Row number.

Item

Item.

Description

Description from Item

Batch

Batch ID. or Serial number from Issue document. It's not possible to change this

Warehouse

Bin location

If this is a WMS, SAP or Beas bin managed warehouse, you can define the Bin location.

This field is only editable if this is a bin/managed warehouse.

The system does not insert the bin location from an issue document automatically if it is in an SAP or WMS managed warehouse.
Customizing, WMS and SAP Support from beas 9.3 PL 2 HF 2

Quantity

Quantity from issue document.

Canceled

Previously canceled quantity.

Cancellation

How much to be canceled now.

UoM

Unit of measurement.

Price

Price from issue document.

Currency

Currency.

 

back to Work order structure

back to WO Structure material postings


Help URL: https://help.beascloud.com/beas202106/index.html?mw_storno_browse.htm