Master Data

Administration > Setup > Precalculation > Calculation schema > Master Data tab

Top  Previous  Next
Expand/Collapse Toggles

In this tab you can set your options for the calculation view.

 

PATH: Administration > Setup > Precalculation > Calculation Schema > Open schema

Schema_Master_SAPStyle

Window pk_schema_edit.psr

 

Schema: Calculation schema ID

Description: Add short description of the schema
Description: Add long description of the schema

 

Calculation view settings (lower window section)

Field

Description

Calculation surcharges for sub positions

If this option is activated, the Display tab appears, and surcharges are calculated not only in the main assembly, but also for all sub-assemblies.

 

Calculation schema per assembly

This option is only active if "Calculation surcharges for sub positions" was enabled.

If this option is enabled, then the surcharges can be edited separately for each sub-assembly.

This is done by double-clicking on the assembly, tab "Schema". This tab is only visible when the option described here has been activated and this scheme has been included in the calculation.

youtube Calculation per assembly webinar

Automatically calculate

 

Block changes

If enabled, to the calculation in the calculation schema no new object can be included and an existing one cannot be deleted.  This is important when working with the extended display.

Hide calculation schema

Hides calculation schema in the calculation

No scale prices

If enabled, only a sales prices can be entered, which applies for all lot sizes. In this case, all other sales price fields are locked. If the sales price is changed for scale 1, this applies for all other scales.

Always determine current material prices

Delete: With this button you can delete the calculation schema.

 

go back to Calculation Schema

Calculation objects - Overhead costs tab


Help URL: https://help.beascloud.com/beas202106/index.html?master_data_tab.htm