Gantt Display

Production > Capacity Planning, APS > Graphic View > Gantt Display

Top  Previous  Next

A production order is displayed in the graphical view from left to right.

You can switch to the "Boyum new Style" view in the View settings.

 

The production order receives a totals bar (first gray bar at the top edge).

The individual assemblies in turn have their own bar (bar below this).

 

The individual work sequences are linked together by an arrow and represent the processing sequence in the time chart.

The delivery date is indicated by a red dot.

 

 

darstellung1

Example: Throughput of a production order

 

 

 

Structure of a work sequence

The timeline of a work sequence is subdivided into three parts:

1. Transfer time, which is stored in days in the resource

2. The job time, based on set-up time and job time x number of units as per work sequence

3. The idle time as per work sequence.

 

In the graphical view, there are other symbols or color displays that indicate e.g. the status of the production order.

 

darstellung_fag

External operation (orange background).

darstellung_ag

Normal operation consisting of transfer time, setup + processing time (green range) and idle time.

darstellung_angemeldet

Work sequence currently logged in.

darstellung_teilgemeldet

There has already been a partial login to this work sequence.

darstellung_gedruckt

Normal work sequence, position has already been printed.

darstellung_parallel

Parallel resource.

darstellung_werkzeug

Resource of type Tool.

lock

Production order is marked as "Planned".

darstellung_liefertermin

Delivery date.

darstellung_liefertermin2

Delivery date cannot be met.

darstellung_fixiert

Work sequence is fixed to a deadline. This is considered in forward scheduling.

darstellung_markiert

Marked work sequence. In the event of rescheduling, all production orders in which a work sequence is marked are recalculated.

darstellung_ueberschneidung

Overlapping: The following work sequence was fixed and its start is BEFORE THE END of the previous work sequence. In this case, red shading is applied.

 

 

Icon changes:

Green/Red flag: Within/past the delivery date.

 

Icons and colors - OLD style

Description

Icons and colors - "Boyum new Style"

Gantt_timecut

Time cut


Gantt_ExternalOP

External operation

RGB(93,93,93)

Image

Gantt_deliverydate

Delivery date. When delivery date has passed, the color changes to red.


Gantt_Tool

Tool resource

RGB(52,98,108)

Image

Gantt_transit

Transit time

 

RGB(128,139,159)

Image

Gantt_resource_Startend

Resource start-end

RGB(20,39,78)

Image

Gantt_order

Work order


Gantt_idle

Idle time

RGB(221,221,221)

Image

Gantt_parallel

Parallel

RGB(163,210,202)

Image

Gantt_Startend

Resource Start-end


Gantt_WO_end

Finished work order


Gantt_not_enoughstock

Not available material


Gantt_AvailableMAT

Material is available


Gantt_operationFIN

End of the operation


Gantt_redarrow

Marker function to perform action on an operation.
Enable to fix an operation.


Gantt_Fixtime

Fixtime



Alternative resource

RGB(94,170,168)

Image

 


Help URL: https://help.beascloud.com/beas202106/index.html?gantt-darstellung.htm