WO structure Material postings

Production > Work order general > WO structure > FA Struktur Materialbuchungen 

Top  Previous  Next
Expand/Collapse Toggles

On material level information on batches and serial numbers, the material requirement, postings and reservations are displayed.

Double-clicking on the posting line opens the posting document (user needs authorization "MW Journal").

 

Status icons for material

Icon

Meaning

item_batchnumber

Batch (incoming, or outgoing).

item_serialnumber

Serial number.

resource1

reservation_100

reservation_120

Reservation: Grey: goods reserved, but planned quantity not reached.

Green: required planned quantity reserved.

Red overflown: too much reserved.

 

Below the material posting the journal entry is displayed.

 

Postings

Icon

Meaning

item_receipt

An assembly has been posted already. If this is a batch or serial number related assembly, a batch or serial number-related material can be linked to it.

See

Batch tracing, Serial number tracing, Linking batches / serial numbers.

item_issue

Material has been charged off already.

journal_header

All journal entries for this work order.

(user needs authorization (Journal entries).

See Journal.

journal_line

%PROGRAMNAME%> Journal. Entry displayed below the barreljournal_header. See Journal.

journal_sap

SAP-account movement (Journal) displayed below the barrel journal_header à journal_line

Right to planned quantity: a value was entered in "Issue batch remains..."  

 

Right-click on posting entry

Function

Meaning

Cancel: xxx

Opens the Cancellation window.

This function is displayed at material issue or at posting in assemblies. A posting document, a serial number or a batch posting can be canceled.

 

Note:

Correct WIP accounting works only using the cancellation feature, as well as a correct valuation of later postings.

 

Batch tracing

For batch items: Open batch tracing.

 

Depending on window settings in structure view, a simple variant of that feature is available. That means, posting entries are displayed right below the batch.  

For restrictions see: integrated batch tracing.

Provision

For provision parts: open linked provisions.

External production goods receipt

Open goods receipt for external production items.

 

 

Right-clicking above in the window (below the title line) opens the window settings for the structure view. See Configuration of WO structure view.


Help URL: https://help.beascloud.com/beas202106/index.html?fa_struktur_materialbuchungen_.htm