Standard costs
If active, this batch calculation is used for valuation of standard costs. In this case, the button „stock revaluation" is displayed in the results list. You can revalue the calculated items with this option.
Furthermore, this switch affects the standard valuation method.
Post calculation – Single stage valuation
In one stage post calculation "last Precalculation" can be used as a valuation form. The Precalculation in which this switch was activated is considered in this case.
See Configuration wizard - Post calculation - Singe stage valuation
Note
If enabled, the type of batch calculation is set automatically to "valuation".
For "Pricing per warehouse" you need to set up "per warehouse" here.
Do not select the option "save Precalculation".
See:
Batch calculation – stock revaluation
Valuation of assembly – Standard costs method
Concept: valuation of assemblies
WO items
Edit Batch-calculation – Standard costs
|