In Routing position > Extended you can define the Scrap of Material related to a routing position.

 

Example:

You must produce and fill 6 kg of paste

15% is lost during filling

Now it must be calculated how many liters of paste are needed.

 

Calculation

Correct formula is: Quantity: (100  – scrap% )  * 100

 

If you need 6 kg of finish product, then you need

6 kg : (100 -  (0.15) * 100 = 7.059 kg paste

 

If you see the opposite:

I fill 7.059 kg paste and lose 15% =

7.059 - (7.059 / 100 * 15) = 6 kg

 

In the Configuration wizard > "Behavior for Routing Scrap of Material % affect to" you can define how the program should work.

 

 

The following settings are available:

hmtoggle_plus1Only the linked material is affected by the Scrap % setting
hmtoggle_plus1All materials under the last linked materials are affected
hmtoggle_plus1All materials are affected by the Scrap % setting

 

Notes:

This field is only visible, if in Configuration wizard > Master data > routing > operation related material scrap" is enabled.

The Item Report – Item Structure report does not support the Material Scrap factor on Routing Level.

Enable this option only if absolutely necessary; the computation will take considerably longer.

In work order this field is blocked, because scrap of material is determined only at the moment of creating the work order

When checking which routing positions are considered, the following criteria apply:
- Validity date
- Active (no formula, no quantity check)
- Variants (A–Z)
Not checked:
- Variants formulas, Product configurations


Help URL: https://help.beascloud.com/beas202106/index.html?conceptscrapofmaterial.htm