Milestones

Production > Milestones

Top  Previous  Next

In operation, routing, production scheduling and in calculation, milestones can be added. These are predefined in Production > Milestones.

In Operation type the check mark "Milestone" is required. In the production routing, a date for the milestones can also be entered.

 

PATH: Production > Milestones

Milestones
Window stamm_milestone_result.psr

 

Tabs:

Tab

Meaning

Master data

List of milestones.

Milestones

List of milestones stored in the routing positions.

This list can be used for an analysis, exported to Excel, and filtered and sorted as necessary. This can be set up using the window settings.

 

Functions

Open/Add: Open existing milestone or create a new one.
Remove: Remove selected milestone.

 

Milestones tab – Window settings entries:

Field

Meaning

Milestones

Milestone flag.

Description

Milestone description.

Document

Document.

Position

Assembly position.

WO Stat.

Position.

Resource

Resource ID.

Activity

Activity description.

Milestone date

Specified milestone date in the routing sequence (in the work order).

Plan date

Planned start date of the routing position.

Last Message

Last time receipt for this routing position.

Closed

Routing position closed?

Work Order

Work order - order number.

Customer Name

Customer Name.

Additional Text

Additional text in work order.

Item

Item number of the assembly to be produced.

Item Description

Item description of the assembly to be produced.

Drawing Number

Drawing number of the assembly to be produced.

DIN

DIN.

Raw Material

Raw Material.

Match Code

Match Code.

Material Group

Material Group.

Date of Print

Print date of the work order.

Date closed

Date the production position was closed.

Project

Project ID.

 

see Event control


Help URL: https://help.beascloud.com/beas202402/index.html?meilensteine.htm