In operation, routing, production scheduling and in calculation, milestones can be added. These are predefined in Production > Milestones.
In Operation type the check mark "Milestone" is required. In the production routing, a date for the milestones can also be entered.
PATH: Production > Milestones
Window stamm_milestone_result.psr
Tabs:
|
|
Master data
|
List of milestones.
|
Milestones
|
List of milestones stored in the routing positions.
This list can be used for an analysis, exported to Excel, and filtered and sorted as necessary. This can be set up using the window settings.
|
Functions
Open/Add: Open existing milestone or create a new one.
Remove: Remove selected milestone.
Milestones tab – Window settings entries:
|
|
Milestones
|
Milestone flag.
|
Description
|
Milestone description.
|
Document
|
Document.
|
Position
|
Assembly position.
|
WO Stat.
|
Position.
|
Resource
|
Resource ID.
|
Activity
|
Activity description.
|
Milestone date
|
Specified milestone date in the routing sequence (in the work order).
|
Plan date
|
Planned start date of the routing position.
|
Last Message
|
Last time receipt for this routing position.
|
Closed
|
Routing position closed?
|
Work Order
|
Work order - order number.
|
Customer Name
|
Customer Name.
|
Additional Text
|
Additional text in work order.
|
Item
|
Item number of the assembly to be produced.
|
Item Description
|
Item description of the assembly to be produced.
|
Drawing Number
|
Drawing number of the assembly to be produced.
|
DIN
|
DIN.
|
Raw Material
|
Raw Material.
|
Match Code
|
Match Code.
|
Material Group
|
Material Group.
|
Date of Print
|
Print date of the work order.
|
Date closed
|
Date the production position was closed.
|
Project
|
Project ID.
|
see Event control
Help URL: https://help.beascloud.com/beas202402/index.html?meilensteine.htm
|