In this tab you can edit extended settings for the opened shift model.
PATH: Human Resources > Personnel > Open an entry. > Personnel administration XXX > Shift model tab > button Open/Add > "Extended" tab
Window bde_personal_rglarbzeitendetail.psr
Field descriptions
Field
|
Description
|
Optional period rule
|
Optional Period rule to be used.
|
Evaluation by report
|
You can define which information should be issued in the time evaluation. Here it is possible to deposit the report definition to be used.
|
Max overtime
|
. This is the maximum reading for the following month. All hours exceeding this limit, be cut off automatically. (Example of use: if generally, overtime is expiring at the beginning of the month).
|
|
Plan hours / month
|
Hours according to shift are not longer considered.
The program calculates the hours per day the person has to be present.
|
|
Help URL: https://help.beascloud.com/beas202404/index.html?extended3.htm
|