Bill of Materials Variant

Sales - AR > Precalculation > Edit Precalculation > Bill of Materials  > Bill of Materials Data > Bill of Materials Variant

Top  Previous  Next

In this tab you can define for which Variant the Bill of Materials position is active.

 

Precalculation_BOM_Variant_SAPStyle

Window pk_material.psr

 

In this window you can define up to 26 variants. It is accessible from the Item Master for XXX window.

 
Example:

PATH: Inventory > Item report > Item Master Data > "Master Data" tab > "Variant" sub-tab.

Item_master_Variant_tab_SAPStyle

Window artikel_edit.psr

 

Tab "Variant"

Field

Description

Variant

Possible variants ( A–Z).

Description

Description of the variant.

 

Before you can select variants for BoM and Routing, you must enable them in the view: right-click > Window settings. Scroll down in the new window and select the variants you want to have displayed. These settings apply globally and not per item, that means even if you only have 5 variants of an item, you must always enable the maximum number of options.

 

Select then the BoM or Routing tab, to create the different BoMs or Routing positions for each variant. Using check boxes you can assign each BoM item or operation to the variants. All BoM items can be added or removed to any variant.

 

Tab "BoM" and "Routing"

(only visible when enabled in window settings).

Field

Description

V-A

Variant assignment (BoM for "A").

V-B

Variant assignment (BoM for "B").

......


V-Z

Variant assignment (BoM for "Z").

 

back to Item Master


Help URL: https://help.beascloud.com/beas202402/index.html?bomcalcvariant.htm