Trigger if system create a bill of material position after trigger of variant system
Only while creation work order, not pre calculation or new item
Variable  | 
Read  | 
Write  | 
Description  | 
|---|---|---|---|
e_WoDocEntry  | 
x  | 
  | 
Work order Document Number (only number)  | 
e_WoLineNumber  | 
x  | 
  | 
Work order position line  | 
e_WoLineNumber2  | 
x  | 
  | 
Bill of Material position  | 
e_Refresh  | 
x  | 
  | 
In refresh mode the work order will be created in parallel for synchronization the changes. But this work order is not saved in database. It's only temporally.   | 
Additional variables:
All table fields from BEAS_FTSTL with prefix e_
Example: The Material: "e_art1_id"
All this fields changeable !
If you cancel the process, the BoM Position don't will be inserted or will be inserted as inactive position.
![]()
function CreateWorkOrderBom
if <e_art_id> = "RM" then
  setvar=e_udf1="RM-Item"
end if
end function