Executed while capacity calculation for every routing position at begin of a routing position, before calculation of transfer time
Only Forward calculation

Variable  | 
Read  | 
Write  | 
Description  | 
||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
e_Method  | 
x  | 
Calculation Method MRP Executed by MRP, ATP, CTP Workorder Executed manually from work order Or the Calculation Method, which defined in APS List  | 
|||||||||||||
e_MethodStep  | 
x  | 
In Method you can define more then one Step. This is the Step. First step is 1  | 
|||||||||||||
e_DocEntry  | 
x  | 
Work order document number  | 
|||||||||||||
e_LineNumber  | 
x  | 
Work order position number  | 
|||||||||||||
e_LineNumber2  | 
x  | 
Routing Position  | 
|||||||||||||
e_BaseDocEntry  | 
x  | 
Base document, example Sales order. Only in MRP  | 
|||||||||||||
e_BaseLineNumber  | 
x  | 
Base document line  | 
|||||||||||||
e_ItemCode  | 
x  | 
Calculated Item Code  | 
|||||||||||||
e_Quantity  | 
x  | 
Calculated Quantity  | 
|||||||||||||
e_CheckReservedTime  | 
x  | 
Check reserved times  | 
|||||||||||||
e_RoutingSplitt  | 
x  | 
Allow Routing Split true/false  | 
|||||||||||||
e_Simulation  | 
x  | 
Simulation true/false  | 
|||||||||||||
e_CalcSaveType  | 
x  | 
Save type 
  | 
|||||||||||||
e_ReservationType  | 
x  | 
||||||||||||||
e_Resource  | 
x  | 
x  | 
Resource Id If you change resource, the system make only the time reservation on this resource, but don't change the resource on routing position  | 
||||||||||||
e_TimeLine  | 
x  | 
x  | 
Time line in format yyyy/mm/dd hh:mm Backward: The End Date Forward: The Start Date 
 Note: The time line is between transit and idle time in forward calculation you can go only forward in time line in backward calculation you can go only backward 
 
  | 
||||||||||||
e_Duration  | 
x  | 
x  | 
Duration in minutes  | 
Every Date must have follow format: yyyy/mm/dd hh:mm
If you use another format, then the system don't save the value in correct way.
NOTE:
The system don't check the changes. If you change any parameter, you must check all / calculate other parameters too.
The system save the changes in Work order routing position, but this don't have effect to time reservation table BEAS_RESOURCEN!
Example
If APS Calculation Methode is forward then the Resource "1900" start always at 14:00
// ******* StartCalcRoutingPositionForward ********
// Created 2020/02/11 by Martin Heigl
function StartCalcRoutingPositionForward
if <e_Method> = "forward" and <e_Resource> = "1900" then
setvar=e_TimeLine=<e_TimeLine,left 11> 14:00
end if
end function