Executed while capacity calculation for every routing position
Before calculation the time period
Only Backward calculation

You can manipulate the time line "e_TimeLine" and Duration
Variable  | 
Read  | 
Write  | 
Description  | 
||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
e_Method  | 
x  | 
Calculation Method MRP Executed by MRP, ATP, CTP Workorder Executed manually from work order Or the Calculation Method, which defined in APS List  | 
|||||||||||||
e_MethodStep  | 
x  | 
APS In Method you can define more then one Step. This is the Step. First step is 1  | 
|||||||||||||
e_DocEntry  | 
x  | 
Work order document number  | 
|||||||||||||
e_LineNumber  | 
x  | 
Work order position number  | 
|||||||||||||
e_LineNumber2  | 
x  | 
Routing Position  | 
|||||||||||||
e_BaseDocEntry  | 
x  | 
Base document, example Sales order. Only in MRP  | 
|||||||||||||
e_BaseLineNumber  | 
x  | 
Base document line  | 
|||||||||||||
e_ItemCode  | 
x  | 
Calculated Item Code  | 
|||||||||||||
e_Quantity  | 
x  | 
Calculated Quantity  | 
|||||||||||||
e_CalcSaveType  | 
x  | 
Save type 
  | 
|||||||||||||
e_CalcType  | 
x  | 
Calculation Type 
  | 
|||||||||||||
e_Direction  | 
x  | 
Current calculation direction 1 or -1  | 
|||||||||||||
e_TimeLine  | 
x  | 
x  | 
Current Time Line. Next Routing position start /end from this time line  | 
||||||||||||
e_Duration  | 
x  | 
x  | 
Duration in Minute  | 
||||||||||||
e_Start  | 
x  | 
x  | 
Total Start  | 
||||||||||||
e_TransitStart  | 
x  | 
x  | 
Transit Start  | 
||||||||||||
e_TransitEnd  | 
x  | 
x  | 
Transit End  | 
||||||||||||
e_ResourceStart  | 
x  | 
x  | 
Resource Start  | 
||||||||||||
e_ResourceEnd  | 
x  | 
x  | 
Resource End  | 
||||||||||||
e_IdleStart  | 
x  | 
x  | 
Idle Start  | 
||||||||||||
e_IdleEnd  | 
x  | 
x  | 
Idle End  | 
||||||||||||
e_End  | 
x  | 
x  | 
Total End  | 
Every Date must have follow format: yyyy/mm/dd hh:mm
If you use another format, then the system don't save the value in correct way.
NOTE:
The system don't check the changes. If you change any parameter, you must check all / calculate other parameters too.
The system save the changes in Work order routing position, but this don't have effect to time reservation table BEAS_RESOURCEN!