(<<) StartCalcRoutingPositionBackward

Executed while capacity calculation for every routing position after calculation of this position and after creating the time reservation table

 

Only Backward Calculation

The Time line is end of idle time

 

aps_routingcalculation_backward

 

 

Variable

Read

Write

Description

e_Method

x


Calculation Method

MRP Executed by MRP, ATP, CTP

Workorder Executed manually from work order

Or the Calculation Method, which defined in APS List

e_MethodStep

x


In Method you can define more then one Step. This is the Step. First step is 1

e_DocEntry

x


Work order document number

e_LineNumber

x


Work order position number

e_LineNumber2

x


Routing Position

e_BaseDocEntry

x


Base document, example Sales order. Only in MRP

e_BaseLineNumber

x


Base document line

e_ItemCode

x


Calculated Item Code

e_Quantity

x


Calculated Quantity

e_CheckReservedTime

x


Check reserved times

e_RoutingSplitt

x


Allow Routing Split true/false

e_Simulation

x


Simulation true/false

e_CalcSaveType

x


Save type

Type

Description


Normal

S

Simulation. Don't save time reservation

I

Simulation. Save nothing

R

Calculation for alternative resource with checking Time reservations

P

Planning: Save all results

e_ReservationType

x



e_Resource

x

x

Resource Id

If you change resource, the system make only the time reservation on this resource, but don't change the resource on routing position

e_TimeLine

x

x

Time line in format yyyy/mm/dd hh:mm

Backward: The End Date

Forward: The Start Date

 

Note: The time line is between transit and idle time

in forward calculation you can go only forward in time line

in backward calculation you can go only backward

 

 

e_Duration

x

x

Duration in minutes

 

Every Date must have follow format: yyyy/mm/dd hh:mm

If you use another format, then the system don't save the value in correct way.

 

NOTE:

The system don't check the changes.  If you change any parameter, you must check all / calculate other parameters too.

The system save the changes in Work order routing position, but this don't have effect to time reservation table BEAS_RESOURCEN!